Gas Commerce

Regional company PT. Malamoi Olom Wobok (MOW) was established based on the Regional Regulation of Sorong Regency Number 21 of 2008 at the initiative of Dr. Drs. Stepanus Malak, M.Si as the Regent of Sorong Regency, then made Notary Deed Number 3 dated January 5, 2009. Given the potential for gas in Sorong Regency, the Regional Company uses the gas to turn it into electricity through a Gas Engine Power Plant (PLTMG) which works. the same as the third party (three) which is then used by PLN to serve electricity needs in the Regency and City of Sorong with an initial capacity of 2 MMSCFD in 2012 and subsequently reaching 8 MMSCFD until now in 2018.

The best of all things considered:

Izin dan Hak Khusus

Gas Trading Permit and Special Rights

  • Decree of the Head of the Investment Coordinating Board No. 34/1 / IU-PB / ESDM / PMDN / 2019

  • Decree of the Head of the Downstream Oil and Gas Regulatory Agency No. 24 / KD / BPH Migas / KOM / 2019

Existing Gas Trading Business Scheme

6.png

Gas Delivery Scheme

1.png
2.png

Gas distribution scheme from MOW to AAPS

3.png

Gas Distribution Scheme from MOW to HI

4.png

Gas Distribution Scheme from MOW to WDP and JPE

Skema Penyaluran Gas
Pengembangan Jaringan
Gas Pipeline Network Development

2019

• Conducted economic and engineering studies in the form of Feasibility Study and Front End Engineering Design for the development of pipelines to the Sorong Special Economic Zone and the Sorong Raya Industrial Zone. (On going)

• Ensure that the amount of natural gas needed for industries in the Sorong Special Economic Zone and Sorong Raya Industrial Zone is in the form of a Supply Commitment (MOU) or PJBG so that it can be used as a basis for proposing additional allocations. (Working on)

• Determine the Gas Source that will be used to determine pipeline network planning

to be built and the possibility of regasification and LNG transportation development.

• The inauguration of the Sorong Special Economic Zone will be held in September in conjunction with the groundbreaking of the Gag Nickel smelter.

2020

• Estimated construction of the gas pipeline network starts in the 4th quarter of 2020.

Community Service Commitment

Forms of service to be performed:

• Development of gas networks for households around the Sorong Special Economic Zone and the Sorong Raya Industrial Zone.

• Construction of Gas Refueling Station (SPBG)

• Construction of the LPG Bottling Plant.

Energy and Utility Needs of Sorong KEK Business Actors

5.png

Provision of electricity in the KEK Sorong and its surroundings

7.png